The the lift span of the still under construction Sarah Mildred Long Bridge is in place and tested. The span currently sits in the open position, probably to avoid the need to staff the bridge before it opens to traffic.
Posted by
Denise Goldberg
at
6:59 PM
Labels: Sarah Mildred Long Bridge