Denise Goldberg's blog

Saturday, November 25, 2017

lift span raised

The the lift span of the still under construction Sarah Mildred Long Bridge is in place and tested. The span currently sits in the open position, probably to avoid the need to staff the bridge before it opens to traffic.

Sarah Mildred Long Bridge, still under construction